top of page
04. PRODUCTION
After the 50% deposit is received in Process 03, your project moves into production and becomes active in our Tracking System.

Tracking Starts
Once the 50% deposit is confirmed, your project is activated in the Ark Tracking System and linked to your ARKCode.
50%
Deposit Received
50% initial payment confirmed

Production Activated
Production stage activated

Tracking Linked to ARKCode
Project records linked to ARKCode
Visible Records
Order proof, material verification, and production records linked to your ARKCode.
Final Factory Check
A structured factory-side check is completed before delivery.
bottom of page











